Detail Information |
|||
Rated Lifting Moment: | Load Capacity,Lifting Weight,Different | Lifting Mechanism: | Electric Hoist |
---|---|---|---|
Power Source: | 3 Phase 380V 50hz,3phase Or Others,380V,50Hz,User Requirments | Crane Feature: | High Efficiency,high Reliability,safety,steel Box Type |
Control Method: | Remote Control,Ground Control Or Cabin Control,cabin Control/wire Rope Remote Control | Application: | Workshop,Warehouse,Outdoor,Widely,factory |
High Light: | 10Ton Remote Control Gantry Crane,16Ton Remote Control Gantry Crane,16Ton ustom Gantry Cranes |
Product Description
1.Electric Hoist Single Girder Gantry Crane Description
Single Girder Gantry Crane is a regular crane widely used at open ground and warehouses to lqad. unload or grab materials.
The capacity:3.2-32ton
The span : 12-30m
The working grade : A5
The working temperature:-20℃ to 40℃
2.Electric Hoist Single Girder Gantry Crane Details
Single Girder Chinese Gantry Crane is used together with CD MD model electric hoist. It is a track travelling small and medium-sized crane. Its proper lifting weight is 3.2 to 32 tons. proper span is 12 to 30 meters its proper working temperature is -20℃to 40℃.
The detail show of single girder gantry crane:
3.Application Place
Single girder crane operating regulations
1. Before work
a. Before a single-beam crane with a cabin, the driver takes over and starts driving, the hooks, wire ropes, safety devices and other components should be checked according to the requirements of the check card, and abnormal conditions should be eliminated if they are found.
b. For ground-operated single-beam bridge cranes, each shift should have a special person responsible for inspection according to the requirements of the check card, and abnormal conditions should be eliminated if found.
c. The operator must confirm that there is no one on the platform or track before turning on the main power supply. When the power circuit breaker is locked or there is a notice board, the main power supply can be turned on only after the original person concerned removes it.
2. At work
a. When lifting heavy objects in each shift (or when the load reaches a large weight), the weight should be lowered after the height of 0.5 meters from the ground, and the brake performance should be checked. After the reliability is confirmed, normal operations can be carried out.
3. After work
a. Raise the hook to a certain height, park the cart at the designated position, and place the controller handle at the "zero" position; pull down the knife switch and cut off the power supply.
b. Carry out daily maintenance.