Product Details:
|
| Product Name: | 5-20 Ton European Standard Single Girder Overhead Crane | Keywords: | Overhead Traveling Crane |
|---|---|---|---|
| Condition: | New | Certification: | CE GOST ISO SGS |
| Feature: | European Bridge Crane | Span: | 7.5-31.5m |
| Lifting Mechanism: | Electric Hoist | Power Source: | 3 Phase 380V 50hz |
| Control Method: | Wireless Remote, Ground, Cabin Control | Application: | Factory,warehouse,Workshop,Plants |
| Highlight: | 380VAC Low Headroom Bridge Crane,Indoor Overhead Crane 380VAC,10 Tone Indoor Overhead Crane |
||
5 Ton 10 Ton Indoor Over Head Travelling Crane Electric Hoist Low Headroom
Indoor Over Head Travelling Crane Information:
The European-style single-girder bridge crane consists of a main girder welded by steel plates and I-beams, an end beam, an electric hoist and a walking mechanism. The electric hoist runs along the lower flange of the I-beam to complete the hoisting of articles.
Lightweight structure, easy to install and maintain.
Indoor Over Head Travelling Crane Parameter:
| pan | m | 7.5 | 10.5 | 13.5 | 16.5 | 19.5 | 22.5 | 25.5 |
| Capacity | t | 1~12.5t | ||||||
| Total weight | kg | 1781~12086 | ||||||
| Trolley weight | kg | 405~740 | ||||||
| Max. Wheel load | kn | 13.5~90.94 | ||||||
| Travel rail | Type | P24~P43 | ||||||
| Lifting speed | m/min | 0.8/5 | 0.8/5 | 0.8/5 | 0.8/5 | 0.8/5 | 0.8/5 | 0.8/5 |
| Lifting height | m | ≥ 6 | ≥ 6 | ≥ 6 | ≥ 6 | ≥ 6 | ≥ 6 | ≥ 6 |
| Total motor power | kw | 4.31 | 4.31 | 4.31 | 4.31 | 4.67 | 4.67 | 4.67 |
| Crane speed | m/min | 3-30 | 3-30 | 3-30 | 3-30 | 3-30 | 3-30 | 3-30 |
| Trolley speed | m/min | 2-20 | 2-20 | 2-20 | 2-20 | 2-20 | 2-20 | 2-20 |
| Working duty | M5/A5 | |||||||
| Certificate |
|
ISO,CE,SGS | ||||||
|
Application area |
Factory,workshop,warehouse,power station,logstic,etc. | |||||||
Advantages of Indoor Over Head Travelling Crane:
1. Overload protection: If the material is over the capacity, the crane will give a sharp warning for protection itself
2. Emergency brake: If the operation staff encounter some emergency situation, we could start the emergency brake system to protection the related treasure.
3. Control Method: Room control or remote control to avoid any injure to the operation staff
4. Main lifting motor: with thermal protection and currency protection.
5. Hooks with latch
6. Rubber buffers
7. Protective earthing
8. Crane switch and travel end switch
9. Sub-assemblies characteristic are tested before assembly.
10.All cranes must be pre-assembled and tested before leaving factory and offer the certification of test.
Indoor Over Head Travelling Crane Images:
![]()
![]()
Contact Person: LEE
Tel: 86-15736960788